日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Cooling system stops at No.5 reactor in Fukushima

 
0 CommentsPrint E-mail Xinhua, May 29, 2011
Adjust font size:

Cooling system at a reactor of the crippled Fukushima No.1 nuclear power plant stopped from Saturday, the plant's operator said Sunday.

Tokyo Electric Power Co. said the pumps to cool the nuclear reactor and fuel pool have stopped at the No. 5 unit, and the operator is now working to switch to backup pumps to restore the cooling system.

When a worker at the plant became aware of the problem at 9 p.m. Saturday, the temperature of the reactor stood at 68 degrees Celsius and that of the fuel pool at 41 degrees Celsius.

They had risen to 87 degrees Celsius and 44 degrees Celsius, respectively, by the time TEPCO began work to restore operations shortly after 8 a.m. Sunday, it said.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 平度市| 隆安县| 探索| 海原县| 田林县| 仙游县| 澳门| 曲麻莱县| 屏南县| 宁远县| 铜川市| 岐山县| 县级市| 遂宁市| 鱼台县| 永和县| 武鸣县| 株洲县| 长白| 龙南县| 渑池县| 西盟| 项城市| 乃东县| 玛沁县| 邯郸市| 永济市| 峨边| 大连市| 伊宁市| 镇康县| 梁平县| 陆良县| 兰西县| 梨树县| 谢通门县| 舟山市| 张北县| 滕州市| 德格县| 车险|