日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / International / State Exchanges Tools: Save | Print | E-mail | Most Read | Comment
China-bound branch pipeline may break ground next year
Adjust font size:

The paving of a China-bound branch line of the Eastern Siberia-Pacific oil pipeline may start at the end of the first quarter next year, Nikolai Tokarev, president of Russia's state-run pipeline company Transneft said in a TV interview on Thursday.

The designing work of the pipeline has been completed after the coordination between Transneft and the China National Petroleum Corp, and the construction project has been presented to related department in Russia for appraisal, said Tokarev, adding that the result is expected soon.

According to last year's cost evaluation, the budget of the project was about 600 million US dollars, he said.

The construction is expected to encounter a series of technical difficulties, including the paving of the pipeline going through the bottom of the Amur (Heilong Jiang) River, but the current technologies can ensure the smooth running of the project, he said.

Transneft wishes to start work as soon as possible, as the pipeline is expected to run synchronously with the 960-km line part in China, which starts from Daqing, China.

The 4,000 km-long Eastern Siberia-Pacific oil pipeline plans to link the Siberian city of Taishet near Lake Baikal and Russia's Pacific region via Skovorodino, the midpoint of the entire route. The first phase of the project, the 2,690-km route goes from Taishet to Skovorodino is expected to have an annual transport capacity of 30 million tons of oil.

The China-bound branch line will run from the midpoint of Skovorodino to the Chinese border under the latest deal between China and Russia. Its document was signed by Transneft and the China National Petroleum Corp during a meeting between Russian Prime Minister Vladimir Putin and his visiting Chinese counterpart Wen Jiabao on Tuesday.

Construction of the first phase of the pipeline was originally planned to start between October to December this year but was later postponed till the end of next year. But Putin in August ordered the speeding up of the construction.

(Xinhua News Agency October 31, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Russia-China-India Oil Pipeline Discussed
- Work on Russia-China Oil Pipeline to Begin Soon
- Study Under Way on Russia-China Pipeline
Most Viewed >>
- Wen's visits to Russia, Kazakhstan 'fruitful'
- Serial blasts in northeast India kill 61
- Ninth kidnapped Chinese in Sudan killed
- Chinese student died after sexually assaulted by intruder in Sydney
- Missile attack kills 20 in Pakistan
> Korean Nuclear Talks
> Reconstruction of Iraq
> Middle East Peace Process
> Iran Nuclear Issue
> 6th SCO Summit Meeting
Links
- China Development Gateway
- Foreign Ministry
- Network of East Asian Think-Tanks
- China-EU Association
- China-Africa Business Council
- China Foreign Affairs University
- University of International Relations
- Institute of World Economics & Politics
- Institute of Russian, East European & Central Asian Studies
- Institute of West Asian & African Studies
- Institute of Latin American Studies
- Institute of Asia-Pacific Studies
- Institute of Japanese Studies
主站蜘蛛池模板: 兰西县| 临湘市| 南雄市| 金沙县| 都兰县| 砚山县| 道孚县| 海阳市| 临清市| 南康市| 西贡区| 朝阳市| 河南省| 汾阳市| 屏东市| 灵寿县| 康定县| 海淀区| 无棣县| 城固县| 大竹县| 重庆市| 城口县| 延庆县| 珲春市| 双桥区| 玉树县| 新沂市| 临清市| 嵊泗县| 商丘市| 稻城县| 和平县| 武功县| 阜平县| 石柱| 乐亭县| 昌宁县| 新丰县| 安图县| 南川市|