日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service


Hot Links
China Development Gateway
Chinese Embassies

Saving Building Now Top Priority
Yesterday's rescue efforts at the site of the collapse of a building near the Bund in Shanghai focused on strengthening a temporary flood-wall with steel bars and fortifying the foundation of a 25-story office building.

It has been three days since a new Huangpu River metro tunnel under construction caved in, causing the collapse of the building and a section of a flood-prevention wall.

Premier Wen Jiabao phoned city leaders on Thursday night, calling on them to "ensure the people's life and property, as well as the safety of the city in the flood season."

Wang Guangtao, head of the Ministry of Construction, arrived at the site yesterday afternoon, along with a group of construction experts.

Wang approved the city government's rescue efforts. He said the local government's reaction and measures were timely and efficient.

The cave-in occurred on Tuesday at the construction site of an emergency passage between two underwater tubes of the new subway line, RT No 4. Sand and water poured in, leading to massive surface subsidence.

In a chain reaction, one building collapsed and five others titled. No one was injured in the accident.

"Protecting Linjiang Huayuan Building is one of the priorities," said a researcher of Shanghai Tunnel Engineering & Rail Transit Design and Research Institute - designer of the subway.

The 25-story tower is the office of the Shanghai Labor and Social Security Bureau.

Also high on the priority list is the fortifying of the floodwall and pulling down two seriously tilting buildings.

Two sandbag walls were set up on Wednesday and Thursday. Steel bars were used for the fortification.

Traffic restrictions in the area has caused congestion, which affected the nearby Bund area and elevated highway system, according to Shanghai General Team of Traffic and Patrol Police.

A total of 12 buses routes were changed or shortened, but the Dongjiadu Ferry was operating as normal.

Meanwhile, a citywide check on construction safety will be launched. At least 200 major urban construction projects will be checked between July 15 and July 30, said Shanghai Construction Management Commission, emphasizing that checks will include the construction design, safety management system and quality.

Tunnel construction is among the main targets.

(eastday.com July 5, 2003)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright ©China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 涞水县| 丰台区| 开江县| 烟台市| 东阳市| 梧州市| 岢岚县| 嘉善县| 孟州市| 赤壁市| 蒲江县| 丰顺县| 淳安县| 福安市| 丹东市| 长寿区| 南充市| 伽师县| 兴宁市| 民勤县| 安乡县| 兴文县| 都江堰市| 潞西市| 平乡县| 通州市| 兴国县| 宝丰县| 凤阳县| 宝丰县| 苍南县| 石河子市| 崇明县| 平凉市| 香格里拉县| 宁陕县| 织金县| 洛南县| 抚州市| 独山县| 闻喜县|