日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / Government / Local Governments News Tools: Save | Print | E-mail | Most Read
Checkpoints Renovation Helps Ease Traffic in Shenzhen
Adjust font size:

Shenzhen has recently completed renovation of the Meilin and Nantou checkpoints, easing greatly the traffic congestion at the two checkpoints by widening the road, erecting footbridges and creating different lanes for cargo vehicles and passenger vehicles

The 100 million yuan (US$12.3 million) renovation project was finished on schedule by the end of last year, according to the city's construction authorities.

Besides pedestrian overpasses, bus stations, U-turn lanes and plantings, new toilets were also added at the two checkpoints for the convenience of pedestrians and drivers.

The renovation of the Meilin checkpoint covered an area of 280,000 square meters. It includes 150,000 square meters of road renovation and 130,000 square meters of plantings.

At present, more than 80,000 vehicles pass through the Meilin checkpoint every day. The traffic flow through the checkpoint during peak hours has recorded an annual growth rate of 31.1 percent.

Before renovation, the Meilin checkpoint had three main problems, which were the lack of a bus stop, the poorly planned U-turn lane and the use of the same lanes for pedestrians and vehicles.

With a bus stop and a pedestrian overpass built at the checkpoint, buses have been separated from the rest of traffic to provide more convenience and safety for passengers boarding or getting down from buses.

The U-turn lane at the checkpoint has also been enlarged.

A new pedestrian overpass was built inside the Nantou checkpoint while the old one outside the checkpoint was renovated.

Two bus stops and two U-turn lanes were also added to the Nantou checkpoint to increase the traffic flow.

In recent years, with Shenzhen's rapid economic growth and urban development, an increasing number of large residential compounds have been built outside the special economic zone.

The increase of pedestrian and traffic flow, which caused traffic congestion and jams at the Meilin and Nantou checkpoints, have long plagued the city's residents.

(Shenzhen Daily January 5, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
New Border Checkpoint Under Way
New Checkpoint System to Simplify Procedures
Checkpoint Planned in Nan'ao
Begging Forbidden Near Checkpoints
Shenzhen Checkpoints to Face Pressure
?
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 广安市| 永清县| 乐至县| 乌审旗| 靖州| 乌审旗| 德阳市| 衡水市| 汉寿县| 泗洪县| 海伦市| 青海省| 通辽市| 崇州市| 云南省| 阿拉善右旗| 名山县| 石狮市| 册亨县| 富锦市| 潮州市| 乌恰县| 保山市| 洛川县| 法库县| 慈溪市| 平阳县| 海南省| 大田县| 社旗县| 永修县| 广西| 宕昌县| 武宣县| 新巴尔虎右旗| 临西县| 西华县| 金塔县| 高青县| 贵阳市| 盘锦市|