日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service


Hot Links
China Development Gateway
Chinese Embassies

Construction of 2008 Main Stadium to Start in December
The construction of the National Stadium, the main stadium of the Beijing 2008 Olympic Games, will begin on December 24, the stadium's operator announced on Friday.

The Beijing State-owned Assets Management Co. Ltd., the official operator of the National Stadium, told a press conference Friday that they have made concrete plans and timetable to guarantee "the construction work to start as scheduled."

An international design contest was held last December and 14 design enterprises from home and abroad had submitted bids. Three designs will be picked to compete for the final honor.

The 80,000-seat National Stadium, the site of many of the Olympic events, including the opening and closing ceremonies, will be located in the Olympic Green.

(Xinhua News Agency March 15, 2003)

China Holds Design Contest for Main Stadium of Beijing Olympiad
Beijing Organizing Committee for the Olympic Games
New Beijing, Great Olympics
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 尉氏县| 遂平县| 当阳市| 隆回县| 玛多县| 钟祥市| 汕头市| 娄烦县| 六枝特区| 山阴县| 西和县| 昆山市| 博白县| 济宁市| 勃利县| 上饶县| 东丰县| 通化县| 嘉禾县| 阿荣旗| 农安县| 育儿| 惠州市| 托克逊县| 县级市| 清苑县| 汝阳县| 德庆县| 阳西县| 赫章县| 安化县| 桃源县| 新建县| 玛纳斯县| 荔波县| 乐安县| 满城县| 奉节县| 昌图县| 洞口县| 额敏县|