日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies


Railway to Bring Convenience to Tibetans
Baima Zhoima, a 58-year-old Tibetan woman said with a smile she could make a pilgrimage in Tibet every year "when the Qinghai-Tibet Railway is built."

She and her family live in a warm, three-roomed stone house on the 4,500-meter-high Xiacang Mountain near the Tuotuo River in northwest China's Qinghai Province.

A sweet smell from a pot of boiling buttered tea permeates her living room, and the stove's blazing fire cozily warms the people seated around.

Baima Zhoima plays with a 10-month-old baby named Zhoima Qoisan, an orphan she adopted recently. The child chuckles at her as she makes amusing gestures.

As a herdswoman in Tanglha Township in Golmud City, Baima Zhoima has a family of nine, including four adopted orphans.

Her family shifted to its current home two months ago from a Tibetan-style seven-roomed stone house 50 meters away.

The railway from Golmud to Lhasa on which work began last June, is an important part of the mighty Qinghai-Tibet Railway. Due to topographic factors the line was designed to right run across the site where Baima Zhoima's house is located, forcing her family to find another place to live.

Her household was the only one in Qinghai Province affected by the 588-km stretch of railway.

In July, the township government selected a site nearby for Zhoima to build a new house.

"We tried to find a place convenient for her family to live, which won't cause problems in their daily life and farm work," said Zhoumao, deputy head of Tanglha Township.

"The township government has also allocated 5,000 yuan (about US$600) for Zhoima to build a warm house, and has given her 80,000 yuan as compensation for her relocation," Zhoumao added.

The railway runs across Zhoima's 400-mu (about 48 hectares) pasture on which she raises over 600 sheep, 80 yaks, and some horses and camels.

The railway construction crew provided Zhoima's family with plenty of cement, timber and stones to help them build a new house. Zhoima said she planned to add another four rooms next year.

The railway workers have also built a special access passage under the railway for Zhoima, to make the coming and going of vehicles and livestock easier.

They reinforced the passage and steps Zhoima uses for carrying water from the foot of the mountain.

"The government has been very considerate to us and has behaved very responsibly," said Zhoima. "The railway construction hasn't caused us any trouble."

Every day she takes a pot of boiled buttered tea to the railway builders at their workplace near her home.

Thirty years ago, Zhoima's family relocated to Tanglha Township from Nagqu in Tibet. She and her family lived in tents for the next 15 years.

In 1987, Zhoima and her family began building their stone house. It took them four years to build the first four rooms and another few to build the remaining three rooms.

Two years ago, Zhoima traveled to Tibet on horseback, a trip which took her a month to complete.

She saw large aircraft in Lhasa, but says she has never seen a train in her life.

"Planes are so big, but they cause no harm to residents," said Zhoima. "Can trains possibly be bigger than planes?" she wondered, reluctant to have her house dismantled when first asked to do so.

Angnan, Zhoima's son-in-law, who has traveled to many parts of China, explained to Zhoima that a train is as large as dozens of rooms, can carry over 10,000 sheep at a time and can travel from Tuotuo River to Lhasa within twelve hours.

"In order to avoid traversing the area where your house is located, we would have to build a long bridge over the valley or dig a tunnel through the mountain, which would cost ten million yuan, an amount equivalent to the value of all the sheep in Tanglha Township," Shen Yong, an official with the Qinghai-Tibet Railway Construction Headquarters, told Zhoima.

"How long does it take for the train to get to Lhasa from here?" Zhoima asked Shen.

"At most 12 hours."

"Then I can go to Tibet by train whenever I have free time!"

Thrilled at the prospect, she happily agreed to move to the new residence nearby, looking forward to the railroad's completion.

With the majority of the railway to be built on the plateau at an altitude of over 4,000 meters above sea level, the Qinghai-Tibet railway will be the "highest" of its kind in the world.

Expected to be completed in 2007, the railway will be Tibet's first and will play a significant role in boosting Tibet's development.

"While designing the railway's route, we tried to avoid relocation of Tibetans to avoid causing them inconvenience," said Lu Chunfang, head of the Qinghai-Tibet Railway Construction Headquarters.

(Xinhua News Agency November 16, 2002)

Tibet Highway Renovation to Be Completed in 2004
Construction of Qinghai-Tibet Railway Proceeding Smoothly
Railway Construction Makes Way for Rare Antelope
Technicians Prop up Building of Qinghai-Tibet Railway
China Resolves Technical Problems in Building Qinghai-Tibet Railway
World-roof Railway Project Continues in Winter
Qinghai News
China Tibet Information Center
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 汨罗市| 陇川县| 博野县| 福建省| 开化县| 鹤岗市| 通许县| 平阳县| 集安市| 威信县| 葵青区| 高要市| 荥阳市| 铁力市| 禄丰县| 宁波市| 子长县| 绍兴县| 从化市| 湾仔区| 枞阳县| 柘荣县| 临安市| 宣恩县| 莒南县| 文昌市| 巩义市| 婺源县| 滦平县| 安吉县| 鄯善县| 福泉市| 青岛市| 定边县| 确山县| 雷山县| 大庆市| 土默特左旗| 托里县| 保靖县| 丹寨县|