日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

Home / China / Photos Tools: Save | Print | E-mail | Most Read | Comment
Pudong gateway proves real terminal triumph
Adjust font size:

The state-of-the-art Terminal 2 Building of Shanghai Pudong International Airport was put through its paces Saturday and came through the grueling test with flying colors ahead of its official public opening on March 26.

Shanghai Pudong International Airport's Terminal 2 building is seen in a recent photo. Terminal 2 underwent a mock operation on Saturday.

The comprehensive drill covered all aspects of terminal operations, including passenger boarding checks, quarantine inspections, Customs claims and flight transfers.

Special situations were created, such as passengers taking the wrong luggage or traveling with contraband, and sniffer dogs were also on the case.

About 1,300 college and vocational-school students from the city, with simulated domestic and international flight tickets, played the roles of passengers. A Shanghai Airlines Boeing B767 pulled over to a bridge at Terminal 2 during the exercise to demonstrate landing procedures, including how the crew should leave by the new passages.

The terminal building covers a total area of 480,000 square meters. The top floor serves as the international departures area, the second floor for international arrivals and the ground floor for domestic departures.

International transit passengers who don't need to claim luggage can simply go to any of the nine service desks to complete transfer procedures and then move, via a convenient route, to their departure areas after passing security checks.

As distinct from Terminal 1, the new facility has about 100,000 square meters of high-quality carpet in passenger waiting areas. The carpet reduces noise and helps to make the environment cozy.

Toilets, baby-care rooms and smoking areas are on all floors of Terminal 2, while passengers can only find toilets on the ground floor in Terminal One.

The airport authority said 33 airline-operation centers will be moved from Terminal 1 to Terminal 2 in stages on March 26 and April 29.

Travelers are offered three indoor corridors to walk about 500 meters to transfer between the two terminals or they can take free shuttle buses.

A traffic center, between the two terminal buildings and connected with the three corridors, is ready for service. Travelers will find access to the parking lots at the traffic center, plus the Maglev station.

(Shanghai Daily March 9, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
Most Viewed >>
主站蜘蛛池模板: 昌乐县| 柳江县| 凤山县| 军事| 平南县| 平乡县| 西平县| 横山县| 武平县| 杭锦后旗| 隆安县| 吉安县| 柳林县| 延川县| 兴文县| 泰兴市| 玉树县| 大田县| 建平县| 九龙县| 翼城县| 泉州市| 南华县| 商南县| 河间市| 黄浦区| 虎林市| 武乡县| 泌阳县| 胶州市| 长海县| 宣恩县| 宣化县| 铜川市| 霞浦县| 博白县| 德钦县| 永年县| 永春县| 威海市| 昌都县|