日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

New hydropower station begins operation in Tibet

0 Comment(s)Print E-mail Xinhua, June 17, 2011
Adjust font size:

A new hydropower station became operational Friday in southwest Tibet Autonomous Region, as a first step to build a clean energy base in the plateau region.

The Laohuzui -- which translates into "tiger's mouth" -- hydropower station in Gongbo Gyamda County of Nyingchi Prefecture, about 343 km from Tibet's capital Lhasa, is designed to generate 2.5 million to 2.6 million kilowatt-hours of electricity daily to supply Lhasa.

Construction began in 2007.

The 1.288 billion yuan (US$200 million) project has an installed capacity of 102 megawatts, said Ponwa, a deputy official in Nyingchi.

Several other hydropower stations have been built in Nyingchi Prefecture, including the 722.6-million-yuan, 40,000-kilowatt Xoka hydropower station, and the 25-billion-yuan, 3.78 million-kilowatt Songta hydropower station.

Nyingchi Prefecture has 77,000 hectares of rivers and lakes and at least 60 million kilowatts of hydropower reserves.

Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 闽侯县| 根河市| 太保市| 古田县| 淮南市| 永寿县| 安泽县| 汕头市| 巨野县| 常熟市| 油尖旺区| 邢台县| 平谷区| 台中市| 大渡口区| 梅河口市| 调兵山市| 六枝特区| 五大连池市| 密山市| 孟州市| 华亭县| 新余市| 普宁市| 长宁县| 若尔盖县| 潼关县| 手机| 凌源市| 鄂尔多斯市| 遂川县| 会昌县| 辛集市| 普安县| 安仁县| 西城区| 瑞昌市| 凌云县| 敦煌市| 铜陵市| 当阳市|