日韩午夜精品视频,欧美私密网站,国产一区二区三区四区,国产主播一区二区三区四区

 

Power goes out again on new railway

0 Comment(s)Print E-mail China Daily, July 13, 2011
Adjust font size:

More than 30 bullet trains were brought to a halt by a power failure on the Beijing-Shanghai high-speed railway on Tuesday.

That marked the second time a power loss has caused travel delays in the 12 days since the train began operating on June 30.

Railway authorities said an electrical failure occurred in the power grid system near Suzhou, a city in Anhui province, at 11 am on Tuesday.

In a short news release, the authorities said the glitch had been dealt with by 1 pm and that travel on the railway had resumed soon afterward.

The mishap occurred just two days after another power loss on the line. Thunderstorms on Sunday evening disrupted the electrical supply to the railway's Qufu-Zaozhuang section, causing 19 southbound trains to be delayed.

In response to the troubles on Tuesday, railway bureaus in Shanghai and Beijing apologized on their official micro blogs and refunded money to passengers who had canceled their trips.

Even so, the authorities stopped short of explaining the cause of the power failure.

According to accounts railway passengers posted to micro blogs, the power loss led to at least four trains being temporarily stranded in places where there was no bad weather on Tuesday.

Wu Junyong, a professor specializing in railroad electrical engineering at Beijing Jiaotong University, told China Daily: "Judging from a picture posted at Sina.com.cn, an overhead electrical line was burnt, which caused the trains to halt."

The photo, though, offered no indication of how the damage had occurred to the line. Possible causes of the malfunction include an inadequate installation of the wire or the use of poor-quality wire.

"This is an equipment malfunction, severer than the incident on Sunday, when the train cut off its own power supply to protect itself (after lightning hit the overhead lines)", he said.

The malfunction on Tuesday has generated a new round of online discussion and suspicion about the railway, which opened one year ahead of schedule.

Some netizens and experts responded by calling for tolerance and patience.

Wu said that it is common for malfunctions to occur when trains first start to run on a high-speed railway. Such railways are complicated operations and cannot be expected to run free of glitches until various adjustments have been made to it over time.

"The Beijing-Shanghai high-speed rail stretches for 1,318 km and crosses four provinces and three municipalities," he said. "That malfunctions would occur on such a long line when it has been operating for less than two weeks is inevitable and understandable.

"Such malfunctions will become less common after it has been operating for a while longer."

According to previous media reports, trains on the 1,069-km Wuhan-Guangzhou high-speed rail, which has a maximum speed of 350 km/h, were delayed at least five times in the three months after the railway began operating on Dec 26, 2009. Those delays were blamed on equipment malfunctions.

As for the power failure on Sunday, Wu said similar things occur in southern France, where gales and lightning often cause high-speed railways to malfunction. He said foreign and domestic technology cannot be expected to completely shield high-speed railways from the effects of bad weather.

Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
主站蜘蛛池模板: 新宾| 巨鹿县| 固镇县| 阿拉尔市| 霍州市| 垦利县| 隆化县| 红安县| 蓬安县| 静安区| 抚顺市| 永春县| 广宗县| 蒲城县| 海南省| 象山县| 曲周县| 长沙县| 鄂伦春自治旗| 黔西| 布拖县| 大名县| 清徐县| 理塘县| 肥乡县| 同仁县| 界首市| 东乌珠穆沁旗| 山东| 克什克腾旗| 道孚县| 望城县| 米林县| 香格里拉县| 双江| 壤塘县| 嘉义县| 皋兰县| 丰城市| 罗定市| 牡丹江市|